
一 | 近日,国际零磁科学谷重点项目——零磁谷综合环境提升改造工程(一期)完成施工许可证核发,正式迈入实质性施工阶段。 Zero, released in 2018, had not performed well at the box office. The Shah Rukh Khan starrer did not live upto fans' expectations and director Aanand L Rai has recently opened up about the same. He noted that he did not properly make use of Shah Rukh Khan's stardom or weave it into the character. During an interview with Galatta Plus, Aanand noted that he should have understood that SRK comes with a stardom that requires to be utilised. He reveals having realised later that he should have taken care of the actor's image. "The problem with Zero was that, that man..that superstar came to me with so much of love and me being me, I never understood that it’s not an actor director who was going to make a story. There was a superstar attached, his image is there, which I have to understand and get in the film. I was working with an actor, a big actor. I realised much later that there is an image that I had to take care of," the director quipped.He further added that many feel his films are without the baggage of a star. Emphasising on the statement, Aanand shared that he probably does not know how to utilise someone's stardom. "When you say that my films are without the baggage of a star, somewhere I agree that maybe I am unable to incorporate that stardom in my characters. At times, people want to see their stars in a character, but a part of the star should also be there, which I was unable to do. I was floating, those bearings were not there, they were moved," he said. Having said that, the director opened up on working with SRK. Calling it a "rewarding experience," Aanand noted that he should have understood the actor and his image better while filming the movie.Also Read: Tere Ishk Mein Review: Dhanush and Kriti Sanon Shine in This Deeply Intense Love Story。项目预计2028年底建成。

二 |
零磁谷局部航拍。

三 | 作为零磁谷重点环境提质工程,零磁谷综合环境提升改造工程(一期)提升范围北至回龙庵山,南至区界,西临浦沿路,东接火炬大道,将以城市更新重塑“科产城人”融合新图景。
公园游憩服务用房为一期重点主体建筑。
管理用房将全面适配零磁谷各类配套服务需求。立足公园游憩与运营保障需求,项目总建筑面积约1.5万平方米,地上建筑面积约0.8万平方米,地下建筑面积约0.7万平方米,将建设公园服务用房、游憩建筑、驿站、管理用房、公共厕所、地下室等建筑主体,室外配套工程及挡墙工程,同步配建地下人防工程。项目预计2028年底建成。

四 |
该工程是继零磁谷街、福源河提升改造工程之后,布局零磁谷片区的又一项城市更新项目。此前开工的零磁谷街、福源河提升改造项目全长约2.12千米,围绕交通路网优化、河道生态治理、城市风貌提升三大方向一体化实施,推进道路拓宽、路口改造、河道整治、景观提质。随着多项改造工程接续落地,零磁谷片区交通条件、生态基底、公共空间功能将持续完善。资料/滨江发布。
Current article:http://jmyi.linlangdouwaqiexusan.bond/hor0n5/20260826/273456.html
Published on:12:19:00

